KGM to Build EV Assembly Plant in Ethiopia, Targeting East African Exports

South Korean automaker KG Mobility (KGM) is set to establish an electric vehicle knockdown (KD) assembly plant in Ethiopia, positioning the country as a production and export hub for East Africa.

KGM signed a memorandum of understanding on September 22 with Ethiopian B&C Manufacturing Group and South Korea’s Youngsan Glonet to develop the facility. Construction is scheduled to begin in October, with production expected to start in the first half of 2027.

The plant will initially assemble the Torres EVX and Musso EV, with annual production capacity of about 1,000 vehicles. B&C will secure the site, infrastructure and construction, while Youngsan Glonet will provide plant design, engineering and technical support. KGM will supply vehicles and parts.

Beyond Ethiopia’s domestic market, B&C plans to export locally assembled vehicles to Somalia, Kenya, Uganda, Rwanda and Djibouti, making Ethiopia a strategic base for KGM’s East African expansion.

Related

Government Shifts Toward Longer-Term Treasury Bills as Investor Demand Grows

By Muluken Yewondwossen, Special to EBV The Ethiopian government is...

Houthi Control of Perim Raises New Maritime Risks for Ethiopia and the Horn of Africa

Ethiopia faces a growing economic and strategic risk as...

CETU Takes EIH Labour Dispute to Justice Minister

The tension between Ethiopian Investment Holdings (EIH) and the...

Tariku Demissie Named Interim Ethio Telecom CEO

ETBusinessView has learned that Tariku Demissie, Ethio Telecom’s Chief...

From Addis Ababa to the U.S. Congress: The Rise of Melat Kiros

In the early hours of July 1, 2026, Melat...

Popular Categories